The Pond Committee maintains the fountain, aerators, and overall ecological health of the Pond including the fish stock. The Pond Committee also assesses and leads special projects such as the investigation and resolution of erosion along the South bank of the Pond.
Update 11/15/23
After repairing the riprap at the northeast end of the pond, the Pond Committee is starting to research erosion problems along the southeast bank of the pond.
Harry Holman
3409 Beaver Creek Crossing
Robert Hudson
3348 Old Plantation Way
Bank erosion along south side of pond.
Bank erosion along south side of pond.
Rock riprap on east end of pond. Could be covered with dirt and grass.